Skip to main content

Last site visit this year to Church Brampton, great to see the scaffolding finally down, the black basalt zinc looks dramatic and sharp in the bright winter light. Despite sub zero temperatures the SIP structure performing amazing as internally the temperature was 15 deg with no heating on!